Greece is travelling by train again. · Live Train Tracking at railway.gov.gr

Description
The project concerns the complete reconstruction of the Agios Stefanos tunnel in Attica, restoring traffic on the right-hand (up) track of the Athens – Thessaloniki line. The project comprises the complete reconstruction of the old tunnel, with an enlarged cross-section to allow electrification and an increase in freight traffic (through the use of larger loading gauges), as well as the laying of the track with materials meeting the latest specifications for maximum speeds. Technical characteristics: Length of section: 170 m of single track Design speed: 80 km/h Cut & Cover: 62.50 m in length The project contributes to the restoration and smooth operation of railway traffic, with the aim of doubling the capacity of the line and thereby serving greater transport volumes.
Projects in progress
All projects
CONVERSION OF THE ISTHMUS – LOUTRAKI LINE TO STANDARD GAUGE

CONSTRUCTION OF THE SUPERSTRUCTURE, STATIONS AND HALTS, INSTALLATION OF SIGNALLING, TELECOMMUNICATIONS, ELECTRIFICATION AND E/M INSTALLATIONS OF THE PANAGOPOULA TUNNEL ON THE RODODAFNI - RIO SECTION

CONSTRUCTION OF AN ELECTRIFICATION SYSTEM AND NOISE BARRIERS ON THE KIATO – RODODAFNI SECTION
