CONSTRUCTION OF THE SUPERSTRUCTURE, STATIONS AND HALTS, INSTALLATION OF SIGNALLING, TELECOMMUNICATIONS, ELECTRIFICATION AND E/M INSTALLATIONS OF THE PANAGOPOULA TUNNEL ON THE RODODAFNI - RIO SECTION

Description
Works for the completion of the Rododafni - Rio section, 28.8 km in length. 1. The construction of the superstructure of 28.8 km of double railway track, with slab track in the two bores of the Panagopoula tunnel, 4.5 km each, and ballasted track on the remainder of the section. 2. The construction of seven (7) railway halts/stations 3. The electromechanical installations 4. The construction of the electrification with remote control and the connection to the Aigio traction substation. 5. The installation of a bidirectional signalling system with remote control, telecommunications and ETCS Level 1. 6. Other works such as the installation of noise barriers, landscaping works and track safety works.
Projects in progress
All projects
CONVERSION OF THE ISTHMUS – LOUTRAKI LINE TO STANDARD GAUGE

CONSTRUCTION OF AN ELECTRIFICATION SYSTEM AND NOISE BARRIERS ON THE KIATO – RODODAFNI SECTION

UNDERGROUNDING OF THE LINE IN THE SEPOLIA AREA