Line / AxisAttica
Area / RegionAttica
Start date2015
Year of completion2018
Key datesStart of construction: 2015
Completion: second half of 2018
Operation of the electrified Athens Railway Station: 07-2017
Project cost8.5 million euros
Description
The project comprises the works for the upgrading of the double/triple railway corridor Piraeus – Athens – Treis Gefyres, approximately 13.5 km long, of the railway stations on the section (including the main Athens Railway Station), as well as the installation of a modern electrification system. Technical characteristics: Section length: 13.5 km Design speed: 80 km/h The project aims at the modernisation of the Piraeus – Treis Gefyres railway corridor, contributing to the increase of its capacity, so that it can accommodate both suburban and intercity transport traffic.
Projects in progress
All projects
Project in progressLine infrastructure
CONVERSION OF THE ISTHMUS – LOUTRAKI LINE TO STANDARD GAUGE

Project in progressSignalling / remote control
CONSTRUCTION OF THE SUPERSTRUCTURE, STATIONS AND HALTS, INSTALLATION OF SIGNALLING, TELECOMMUNICATIONS, ELECTRIFICATION AND E/M INSTALLATIONS OF THE PANAGOPOULA TUNNEL ON THE RODODAFNI - RIO SECTION

Project in progressElectrification
CONSTRUCTION OF AN ELECTRIFICATION SYSTEM AND NOISE BARRIERS ON THE KIATO – RODODAFNI SECTION

Project in progressLine infrastructure