Electrification Treis Gefyres – Piraeus

Completed projectElectrification
Line / AxisAttica
Area / RegionAttica
Start date2015
Year of completion2018
Key datesStart of construction: 2015 Completion: second half of 2018 Operation of the electrified Athens Railway Station: 07-2017
Project cost8.5 million euros

Description

The project comprises the works for the upgrading of the double/triple railway corridor Piraeus – Athens – Treis Gefyres, approximately 13.5 km long, of the railway stations on the section (including the main Athens Railway Station), as well as the installation of a modern electrification system. Technical characteristics: Section length: 13.5 km Design speed: 80 km/h The project aims at the modernisation of the Piraeus – Treis Gefyres railway corridor, contributing to the increase of its capacity, so that it can accommodate both suburban and intercity transport traffic.