Thriasio Pedio Complex (Phase A)

Completed projectAccessibility
Line / AxisAttica
Area / RegionAttica
Length39.3 km
Start date1999
Year of completion2010
Key datesStart of construction: 1999 | Completion of the project: 2010
FundingCOHESION FUND 2000-2006 & National resources
Project cost214 million euro

Description

The project concerns the construction of a modern complex at Thriasio Pedio, in which the railway and freight activities currently carried out at facilities scattered around the capital will be concentrated. The transfer of these facilities to a single site, outside the residential fabric of Athens, will bring significant environmental and spatial planning benefits for the entire urban complex of the capital. The Complex in question will include: a marshalling yard, a container terminal, a customs office, a freight station, goods warehouses, a group of tracks for stabling wagons with dangerous goods, washing facilities, as well as all the installations necessary to serve the above activities. The physical scope of the project for the construction of the above Complex comprises 2 construction phases: Operational Phase A and Operational Phase B: Technical characteristics: Stations/stops: Thriasio Pedio Freight Centre and Aspropyrgos Railway Station Railway bridges: 4 Grade-separated crossings: 3 Track superstructure: ballasted track with continuously welded rail, 39.3 km in length The project concerns the construction of a modern complex at Thriasio Pedio, in which the railway and freight activities currently carried out at facilities scattered around the capital will be concentrated. The transfer of these facilities to a single site, outside the residential fabric of Athens, will bring significant environmental and spatial planning benefits for the entire urban complex of the capital.