Greece is travelling by train again. · Live Train Tracking at railway.gov.gr

Description
The project concerns the construction of a quadruple-track railway corridor, approximately 5 km in length, on the section from Treis Gefyres to the Acharnes Railway Centre (SKA), with signalling, remote control, telecommunications and electrification. Technical characteristics: Length of section: 5 km of quadruple track Design speed: 100 km/h Cut & Cover: 1,870 m in length Railway bridges: 8, with individual lengths from 10 m to 200 m, totalling 440 m Grade-separated pedestrian crossings: 5 Stations/halts: 3 stations (Agioi Anargyroi, Patission [P. Vasilissis], Kato Acharnes) and 2 halts (SKA and SKA – Acharnes within SKA) The project forms part of the wider works for the construction of the Attica Suburban Railway. the construction of substructure works for the Treis Gefyres – SKA quadruple-track railway corridor the completion of the substructure works within the zone of the Acharnes Railway Centre (SKA) the construction of the superstructure, signalling – remote control and electrification works for the full operation of the railway tracks on the Treis Gefyres – SKA section and within SKA. The works have been designed with a design speed of 100 km/h for the new quadruple-track corridor on the Treis Gefyres – SKA section the construction of railway stations on the Treis Gefyres – SKA section and the works for the installations and equipment of the stations (Agioi Anargyroi, Patission [P. Vasilissis], Kato Acharnes, as well as two halts, SKA and SKA – Acharnes, within SKA) The establishment of a new Traffic Control Centre at SKA E/M installations for civil engineering structures (cut & cover at Agioi Anargyroi & Pyrgouthi), vehicle/pedestrian crossings and open areas on the Treis Gefyres – SKA section. Remaining works required for the completion of the works on the section (such as works for the application of additional protection measures, reinstatement / landscaping of the surrounding area, archaeological works, reinstatement of public utility networks, etc.) The preparation of the remaining studies for the section in question The completion of expropriations
Projects in progress
All projects
CONVERSION OF THE ISTHMUS – LOUTRAKI LINE TO STANDARD GAUGE

CONSTRUCTION OF THE SUPERSTRUCTURE, STATIONS AND HALTS, INSTALLATION OF SIGNALLING, TELECOMMUNICATIONS, ELECTRIFICATION AND E/M INSTALLATIONS OF THE PANAGOPOULA TUNNEL ON THE RODODAFNI - RIO SECTION

CONSTRUCTION OF AN ELECTRIFICATION SYSTEM AND NOISE BARRIERS ON THE KIATO – RODODAFNI SECTION