Greece is travelling by train again. · Live Train Tracking at railway.gov.gr
Urgent corrective interventions on localised sections of track on curves of the P-P double railway line between Afidnes Railway Station (CH. 40+086) – Oinoi Railway Station (CH. 71+394)
Project in progressLine infrastructure

PhaseIn preparation
Line / AxisAfidnes – Oinoi
Project cost4,900,000.00 €
Description
This project concerns corrective interventions to address the above problems, on localised sections of track on curves of the P-P double railway line between Afidnes Railway Station (CH. 40+086) – Oinoi Railway Station (CH. 71+394).
Projects in progress
All projects
Project in progressLine infrastructure
CONVERSION OF THE ISTHMUS – LOUTRAKI LINE TO STANDARD GAUGE

Project in progressSignalling / remote control
CONSTRUCTION OF THE SUPERSTRUCTURE, STATIONS AND HALTS, INSTALLATION OF SIGNALLING, TELECOMMUNICATIONS, ELECTRIFICATION AND E/M INSTALLATIONS OF THE PANAGOPOULA TUNNEL ON THE RODODAFNI - RIO SECTION

Project in progressElectrification
CONSTRUCTION OF AN ELECTRIFICATION SYSTEM AND NOISE BARRIERS ON THE KIATO – RODODAFNI SECTION

Project in progressLine infrastructure