Urgent corrective interventions on localised sections of track on curves of the P-P double railway line between Afidnes Railway Station (CH. 40+086) – Oinoi Railway Station (CH. 71+394)

Project in progressLine infrastructure
PhaseIn preparation
Line / AxisAfidnes – Oinoi
Project cost4,900,000.00 €

Description

This project concerns corrective interventions to address the above problems, on localised sections of track on curves of the P-P double railway line between Afidnes Railway Station (CH. 40+086) – Oinoi Railway Station (CH. 71+394).